I was called out to an emergency meeting with my structural engineer to assess the options. Luckily it wasn't as bad as we had thought and, with a strict regime of pumping and shuttering, we should be able to pour the foundations in four or five sections.
I'll be out again tomorrow to see how they got on with the first concrete load!