I've done a few bits and bobs this weekend.
I am still struggling on with the sockets and switches, filling in the gaps around them before I can make good and do the electrics. I have laid some more limestone flooring in the lobby and utility room and complted the carpentry work to finish the firt floor deck around the stairwell.
The bathrooms are almost done now barring the sinks and furniture (which have been delayed by a week) and a bit of grout (which we have run out of - more on its way for Tuesday). Jamie has also run the drain for the washing machine and tumble drier from the utility to the drain in the kitchen.
Next week is a busy one. The kitchen deliveries will start this week with all of the kit arriving ahead of next week's install, as should the bathroom sinks and furniture. EOn will be installing the electric meter on Tuesday and the electricians will be back to start hooking up all the tech in the utility room.