Tuesday, 17 June 2008

Day 63 - Almost up to DPC

The brick work is continuing slowly but surely. We should be up to DPC after one more day.

    
Posted by Picasa

Thursday, 12 June 2008

Day 61 - Soldier Course

The below DPC brick work continued today, with most of the work both on the roof and the bricks going on at the back of the house. You can see the nice soldier course detail below the back door and the first of the complete sections of slate work - scaffold climbing required!

    
Posted by Picasa

Wednesday, 11 June 2008

Day 60 - Bricks & Windmills

The brick work has begun today and the brickies have started to define the corners of the below DPC courses. The slates have also arrived and are going up on the roof - all at the back of the house though so I can't get a picture from the ground. I'll have to climb the scaffold for you later in the week and get a shot.

We went for a walk on the Fen last night too and, although all of the wildlife was in hiding, I got some good pictures of the Wicken windmill on the way back.

    
Posted by Picasa

Friday, 6 June 2008

Day 58 - Ground Floor Windows

The ground floor windows are now in and the roofing effort continues.

I've also had confirmation that slates will be arriving on Monday/Tuesday next week!

   
Posted by Picasa

Thursday, 5 June 2008

Day 57 - Windows and Roofing Felt

Progress has been slower than expected this week due to bad weather. You can see from the pictures just how wet its been.

Despite this though there has been a lot going on. The sand and cement for the brick layers has been delivered, the roofers have made a start on the felt and batton work on the roof and, best of all, the first of the sash windows have been delivered!

A groundworks crew also arrived to drop the curb on the entrance to Number 49 which will allow the new owner of the bungalow to put in their own driveway and allow us to complete the fence to ours.

The roofers are back for the rest of the week to complete the felt work and Ben and his brick layer team will be working hard to get started despite the wet ground conditions.

         

Sunday, 1 June 2008

Day 55 - Bricks!

The first delivery of bricks is now onsite, albeit blocking access to everything else!

The roofers have begun to get everything organised, and the stone sills arrived on Wednesday - I had to offload them all by hand. Luckily they only weigh 1.3 tonnes...

I'm going to try to recover some of the time lost from the ground works by having the roofers and bricklayers work on site together. It should be all systems go next week.

    
Posted by Picasa

Wednesday, 28 May 2008

Day 54 - Timber Frame Complete

The timber frame work is now complete!

The first fix carpentry has already begun, with the soffit boards on the perimiter of the roof on and the noggins for the kitchen and utility room in place to hold appliances and furniture to the wall.

The roofers start tomorrow!

    
Posted by Picasa

Saturday, 24 May 2008

Day 53 - Roof Complete

The carpenters finished up work on the roof today and will be finishing off on Tuesday, with a frame inspection from Potton booked for Wednesday.

The axed arch lintel detailing arrived today too. These are pre-made from bricks from my main brick order to save time.

There's some bad weather on the way in for Sunday and Monday so I'll be down here on Monday morning to sweep the first floor deck down and keep the water off it as best I can.

 

Friday, 23 May 2008

Ground Source Heat Pump


There is no mains gas in Wicken so, early on in the planning process, we decided that a good way to go would be to employ a Ground Source Heat Pump for all of our hot water.

Provided by Ice Energy, the heat pump kit is made up of two main parts.

Firstly, three 42m long "slinky" pipes are run underground all around the plot 1m below ground. These pipes, installed as part of the ground works, will be filled with water and glycol that will absorb heat from the ground.

Secondly, the main pump is installed in the utility room. It is connected to the ground pipes and pumps cold water out and warm water back in. The water only increases in temperature by a matter of degrees, but the flow rate is high enough to ensure that significant heat can be extracted.

This heat is fed into a mains pressure hot water cylinder by means of a heat exchanger. The result is hot water around 55 deg C which can be fed directly into the underfloor heating system and hot water taps.

If all goes well the resulting system should be around 300% efficient; for every 1kW we put into the pump as electricity we should get 3kW of heat out.

Good news as the price of gas and oil only seems to be getting higher.

It almost makes up for my car...

Thursday, 22 May 2008

Day 52 - Big Crane Part 2

Due in small part to traffic and large part to the Cambridge Beer Festival I didn't get back to the plot today until after 9pm and I only just about had enough light to take these shots of the day's work.

The roof trusses are now all in place and you can really get a feel for how the house will look once its clad in brick and slate in a few weeks time.

   
Posted by Picasa

Wednesday, 21 May 2008

Day 52 - Big Crane

The crane arrived today on schedule and the Potton team began installing the roof trusses. I climbed the scaffold with them to see the first sections swung into place.

Exciting stuff!

    
Posted by Picasa

Tuesday, 20 May 2008

Day 51 - Scaffold Part 2

The scaffolders finally turned up today; they were "rained off" aparently. Its amazing how rain suddenly becomes a far greater hazard on a Friday, isn't it?

The good news is that all of the additional scaffold required - the final front section, an extended area to the back left and a new section over the sun room - is now in place. Oh, and the observant or nerdy ones amongst you will have noticed that the silver vapour check has been sealed up on all of the external wall panels. This will act as a barrier to moisture to protect the frame until the brick work is in place and to keep it dry.

I have also spoken to Potton and confirmed that the crane will be on site on Wednesday morning so I'll be down again first thing with my camera to catch the action!