Sunday, 18 May 2008

Day 50 - First Floor Walls

The work on the first floor is almost complete now. One more day or so and they'll be ready to swing the roof trusses into place with the crane.

I was down on site at 6 am in the rain on Friday to dig out the ground for the scaffolders again who refused to do it themselves for insurance reasons... and then they never turned up! Someone will be getting a irate call first thing tomorrow morning!

Martha and I went onsite together this afternoon to tidy up some of the trees at the back of the plot that were growing in through what will become our bedroom windows. They need a little bit more work but my reach with the loppers from the top scaffold was starting to exceed my grasp (and almost certainly my inurance!).

     

Wednesday, 14 May 2008

Day 48 - Ceilings!

The pace has not abated!

The final side of the scaffold will be in place tomorrow allowing the Potton team to move onto the first floor, with roof trusses being craned into place next week.

  
Posted by Picasa

Monday, 12 May 2008

Day 46 - Windows and Doors

The first of the windows that will be fitted as the frame goes up arrived today, and the carpenters also assembled the wooden posts that will hold the lean-to roof outside the utility room door.

The weather has been amazing all week which has speeded progress. I've included a picture of the fields on the outskirts of Wicken Fen - it will be worth the wait!

   

Thursday, 8 May 2008

Day 45 - We have walls!

The ground floor wall panels went up today and we could for the first time see what it would be like to look out of our windows and walk through our new front door!

    
Posted by Picasa

Wednesday, 7 May 2008

Day 44 - Sole Plates and Front Doors

You can see some of the wall panels for the first time now with their factory fitted insulation from Kingspan (the insulation company that actually bought Potton Ltd a year or so ago).

Walking around the frame parts I also stumbled across something neat; our new front door frame!

    
Posted by Picasa

Saturday, 3 May 2008

Day 43 - Potton Kickoff

7:45am and the Potton team arrive with the first of two fixed rig loads of the day together with their tele-handler fork lift - a very cool piece of kit which enables them to offload the house components from the lorries in a very confined space.

The scaffolders were also on site today to complete the three sides that they started on Wednesday. The final fourth side of the scaffold will be put into place once the carpenters have swung the major pieces of the timber frame into place.

By the end of the day the sole plates were in place showing were the walls of the ground floor will be so once again we got the chance to walk the rooms and get a feel for how the house will be.

Martha is still convinced that it's too small!


      

Wednesday, 30 April 2008

Day 42 - Half way there

Well, we have half a scaffold. Hopefully the weather will improve today and the guys will be able to finish off ahead of Potton's arrival tomorrow.

  

Day 42 - Scaffold Ahoy

The scaffolders started today after yesterday's misfire.

I was on site with my spade from 7:30 this morning to lend a hand as they seem to have an allergy to digging holes. You can see from the pictures how the edge of the trench surrounding the foundations was right where the inside uprights needed to be so muggins here spent several hours digging through the hardcore to get them a level bottom.

I left site just as it started to rain (that'll teach them) and all things being well, they should be finished by close of play today. I'll pop over before it gets dark tonight to check on their progress.

I also took delivery this morning of a 16 cubic yard skip to contain all of the rubbish that the main build will generate and some roofers undercloak which the Potton team will use to wedge under the sole plates of the frame to level out any imperfections in the slab.

Oh, and I forgot to mention that we measured the slab yesterday to check the dimensions: it was correct to the nearest millimetre. Well done Supercrete!

All the effort has paid off.

  

Tuesday, 29 April 2008

Pikeys

As some of you will already know, we had half of our lead roof stolen at the new offices last week. The culprits moved and covered all of the security cameras whilst they removed our roof of the burdern of being watertight over a six hour period one night.

As you can imagine we're less than happy!

As a result I've been thinking about security in general and am going to take the blog private in a day or so's time. This will mean that you'll have to login to get access to it and that not everyone (hopefully not many pikeys have internet access anyway) can see what's going on on site.

I will email out invites to all of those that I have sent the blog to in the past, but if you don't get one, please don't hesitate to email me and I'll add you to the list.

Slight Delay

Scaffolding isn't going up today as there is a small problem with the levels surrounding the slab that I'll need to iron out with the scaffolders before they can start. All things being well they should be on site tomorrow to get started.

Potton aren't starting until Friday am now so there will also be a slight delay there.

Good news is that Building Control and the warranty provider Premier have signed off on the foundations so the bank has authorised the next tranche of funds for the build.

I won't have to sell a kidney!

Well, at least not until the first fix...

Sunday, 27 April 2008

Day 41 - Foundations Complete

The slab looks wonderful and the foundations are now complete!

The ground workers have removed the shuttering and cleared all but a small amount of the remaining earth away. What remains will be used to fill in around the foundations and rainwater harvester later in the build. The sewer pipes have been left at the boundary of the slab for now to avoid traffic from the subsequent building stages damaging the chamber which will be installed in the driveway to link up all of the pipes later in the build.

Scaffolding will be going up on Tuesday and I will be inspecting the site for the final time with the team from Potton then before the timber frame is delivered on Thursday.

Full steam ahead!

   
Posted by Picasa

Thursday, 24 April 2008

Day 40 - Concrete anyone?

The day of the pour.

The first of eight cement mixers arrived on site this morning at 7:45 and the concrete began to flow. The site was all ready and prepared with the damp proof membrane complete and the steel meshing in place.

The ground workers' spirits fell slightly when they learned that the concrete pump that they had booked hadn't turned up so they'd have to move the concrete around the old fashioned way until we could get another brought over, but once they got stuck in progress was good.

I'll pop back later today to see how they got on.

     

Tuesday, 22 April 2008

Day 38 - Damp Proof Membrane

The soil pipes and ducting for the BT, electrical and harvester are now in and insulated, and the damp proof membrane is going down. This will wrap the concrete in a waterproof plastic that prevents moisture from getting into the slab, keeping the timber frame and the floor dry.

The concrete pour is booked for Thursday morning and I'll be back on site then to get some pictures for you as the slab is poured.

   
Posted by Picasa

Saturday, 19 April 2008

Day 36 - Well, almost ready to pour

The service ducting is going in now to carry the many cables and pipes that need to run under the house through the concrete slab. Hardcore is being laid witin the shuttering and steel mesh will be laid around and over this to tie the whole structure together.

  
Posted by Picasa